An Assessment of the Causative Factors and Effects of Delays in Building Construction Projects in Osun State, Nigeria. (Published)

Delay in building construction project is a universal phenomenon that is not peculiar to Osun alone. In fact, all countries of the world are faced with this global issue. These delays are usually considered as costly to all parties concerned in the projects and very often results in total abandonment thereby slowing down the growth of the construction sector. The purpose of this study was to assess the causative factors of delays and their effects on building construction projects in Osun. A total of forty two (42) project delay attributes and seventeen (17) effect attributes were identified through detailed literature review. Questionnaire survey were conducted across stakeholders that included among others; consultants, contractors and clients cutting across the building professionals namely; Architects, Builders, Quantity Surveyors, Estate Surveyors and Engineers to gather their views on causes of delay in delivery of projects. The research categorized the causes of delay under four main groups of client related, consultant related, contractor related and delay caused by incidental factors and their effects assessed using relative importance index (RII) as a basis for analysis. The RII for all delay factors and group of categories was computed so as to rank the factors. A total of 260 questionnaires were distributed among the respondents from different building construction firm in Osun state. Out of 260 questionnaires distributed, 234 valid questionnaires were retrieved back from the respondents, representing a response rate of (90.0%). The validation of information in this study yielded a Cronbach’s alpha of 0.891. The most significant factors of construction delays were identified as: cash flow problem (delay payment) with (RII=0.89), incomplete drawings (RII=0.84), improper planning and scheduling problem (RII= 0.91), financial incapability (RII = 0.89) and force majeure (Acts of God) with (RII = 0.81). The study revealed that overall, contractor-caused delays ranked highest with (RII=0.91) and was attributed to improper planning and scheduling problem, followed by financial incapability (RII = 0.89), while client-caused delay  attributed to cash flow problem (delay payment) (RII=0.89) was observed as the second most common cause of delay in building construction project in Osun state. Furthermore, the study revealed increase in final cost of project (RII = 0.88) and extension of time on project (RII = 0.80), as the top two (2) effects of delays in building construction project in Osun state, while cash flow (RII = 0.52) had the least effect. It is therefore believed that identification of the causes of potential delay factors that are likely to affect the timely delivery of projects can help to avoid extra costs through claims and disputes that arise among parties when delays are experienced.

Keywords: Causative factors, Construction Projects, Construction delays, Effects of delay, Nigeria, Osun State, RII

Effects of Lowest Bidding Bid Awarding System in Public Sector Construction Projects In Pakistan (Published)

Construction industry participants have started recognizing that accepting the least price bid does not guarantee maximum value. Achieving a value-based procurement approach is a challenge, particularly for the Pakistani public sector clients, who are limited in  their ability to evaluate the competitive bids  based  solely on the lowest-bid award system. Persisting problems of  inferior  quality  of constructed facilities, high incidence of claims and litigation, and frequent cost and schedule overruns have become the main features of Pakistan’s public construction works contracts. This research was undertaken to assess the performance of public owned construction projects awarded on a lowest bidder bid awarding system. Also, the objective was to  seek construction  professionals’  opinions  about  the  traditional  bidding  procedure  and  other alternative systems  for  evaluation  of  bids  and  awarding  contracts. An extensive  literature search  was  carried  out  to  identify  different  practices  and  a  questionnaire  survey  was conducted  among  the different  groups that  make  up  the construction  industry in  Pakistan. Five alternate bid evaluation and contract award methods are discussed and presented in this research. The    questionnaire was distributed   online as well as through visits   to contractors, clients and   consultants. Additionally, 12 interviews were conducted with clients, consultants and contractors. In total 200 questionnaires were distributed. The data were collected and 112 valid questionnaires were analyzed by using MS Excel, PH stat, SPSS-20 and Sigma XL. The study concludes that 70% of the respondents consider the multi-parameter bidding method is to be more effective than lowest bidding method and ranked this method as best amongst all six selected methods. Insights and discussions are given in the analysis. Finally, this work will provide valuable information to clients, consultants and contractors and other stakeholders who desire to improve bidding methods in construction in Pakistan.

Keywords: Bidding System, Construction Projects, Public Sector Construction, Public Sector Procurement.

Effects of Lowest Bidding Bid Awarding System in Public Sector Construction Projects In Pakistan (Published)

Construction industry participants have started recognizing that accepting the least price bid does not guarantee maximum value. Achieving a value-based procurement approach is a challenge, particularly for the Pakistani public sector clients, who are limited in their ability to evaluate the competitive bids based  solely on the lowest-bid award system. Persisting problems of inferior quality of constructed facilities, high incidence of claims and litigation, and frequent cost and schedule overruns have become the main features of Pakistan’s public construction works contracts. This research was undertaken to assess the performance of public owned construction projects awarded on a lowest bidder bid awarding system. Also, the objective was to  seek construction  professionals’  opinions  about  the  traditional  bidding  procedure  and  other alternative systems  for  evaluation  of  bids  and  awarding  contracts. An extensive  literature search  was  carried  out  to  identify  different  practices  and  a  questionnaire  survey  was conducted  among  the different  groups that  make  up  the construction  industry in  Pakistan. Five alternate bid evaluation and contract award methods are discussed and presented in this research. The    questionnaire was distributed   online as well as through visits to contractors, clients and consultants. Additionally, 12 interviews were conducted with clients, consultants and contractors. In total 200 questionnaires were distributed. The data were collected and 112 valid questionnaires were analyzed by using MS Excel, PH stat, SPSS-20 and Sigma XL. The study concludes that 70% of the respondents consider the multi-parameter bidding method is to be more effective than lowest bidding method and ranked this method as best amongst all six selected  methods. Insights and discussions are given in the analysis. Finally, this work will provide valuable information to clients, consultants and contractors and other stakeholders who desire to improve bidding methods in construction in Pakistan.

Keywords: Bidding System, Construction Projects, Public Sector Construction, Public Sector Procurement.