International Journal of Management Technology (IJMT)

EA Journals

Piping Fabrication/Installation Management and Deliverables of the Hydrocarbon Processing Plant in Umusadegbe, Delta State, Nigeria: An Operations Management Perspective

Abstract

This study sought to establish the impact of piping fabrication/installation management on the project deliverables of Umusadege hydrocarbon processing plant in Kwale, Delta State, Nigeria. Piping fabrication/installation management was dimensioned with four cardinal management processes which include project initiation, planning, execution and closure. While the deliverables were measured using As-built documentations and On-site activities.  This gave rise to eight hypotheses which were tested using the Pearson’s Product Moment Correlation technique; aided by International Business Machine Statistical Product and Service Solutions (IBM SPSS) version 21.0 at the 0.05 level of significance. The analyses revealed that there is a strong significant relationship between the dimensions of piping fabrication/installation management and the measure of deliverables of the hydrocarbon processing plant. Based on this it was concluded that piping fabrication/installation management is an antecedent of the project deliverables of Umusadege central processing facility.

Keywords: as-built documentations, on-site activities, project closure, project execution, project initiation, project planning

cc logo

This work by European American Journals is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 4.0 Unported License

 

Recent Publications

Email ID: editor.ijmt@ea-journals.org
Impact Factor: 5.78
Print ISSN: 2055-0847
Online ISSN: 2055-0855
DOI: https://doi.org/10.37745/ijmt.2013

Author Guidelines
Submit Papers
Review Status

 

Scroll to Top

Don't miss any Call For Paper update from EA Journals

Fill up the form below and get notified everytime we call for new submissions for our journals.