The Inter-Institutional Coordination on the Development of Regional Innovation System in Bantul District (Published)
Research coordination between the institutional elements of science and technology in RIS Bantul based on the facts that explicitly indicates the lack of coordination in the period of (post-construction) PLTH operation. Coordination among institutions in the development of RIS Bantul district is the focus of the research. Locus studies were conducted in the area around Hybrid Power Generation Pantai baru Pandansimo which is administratively located in Bantul district. The results showed that the coordination between the institutional elements of science and technology in the development of RIS Bantul had not been effective. The coordination strategy based on the dimension of time that had been studied, such as the coordination of planning, coordination of implementation, monitoring, feedback and control, especially external coordination both vertically and horizontally, it is proven that the strategy for coordination in the ‘communicative’ still can not be performed optimally in accordance with the character network caused weakens the effectiveness of coordination systemically. The coordination network character that occured in the development of RIS Bantul terms of six characters network studied which showed that the elements of Interdependence are sequential, the Size element can be classified as a small network, the Structure element showed that the character of the network had not been or was not structured, the Complexity element was still in the category of being shaped, the Autonomy element was less autonomous or average, and the Mission element in the character of the network was relatively still low. There were two roots problem that had been identified by researchers as a trigger of the coordination condition between the institutional elements of science and technology in RIS Bantul district which had not been effective, they were: (1) in the coordination of planning, there was no comprehensive RIS Document Development Master Plan in Bantul district, and (2) in coordinating of the implementation, monitoring, feedback and control, the legal form of PLTH management agencies and other related facilities had not been determined.
Keywords: Character of the Network, Coordination Strategy, Dimension of Time, External Coordination, RIS in Bantul District